End in . Register Now
Free Consultation
+974-77290171
Please enter your email.
Invalid email address.
Post Your Requirements
Teach On SkillXplore
[email protected]
If you already have an account with us, please login at the login page.
Please Fill All Details
{{add_user_message_success}}
{{add_user_message_error}}
Please enter your first name.
Please enter your last name.
{{user_details_message}}
Please enter your password.
The password must have 6+characters.
Please enter confirm password.
Password does't match with confirm password
{{login_user_message_error}}
For the refund, you can raise your queries to [email protected]
Question 1
RC cantilever wall is used to retain an engineer fill as shown. Drains are designed so that water pressure does not build up behind the wall. Which of the following patterns shows the correct placement of flexural reinforcement in the wall?
Question 2
For the 2D rigid frame shown, the bending moment (k-ft)
Question 3
A trapezoidal channel has bottom width of 2ft a longitudinal slope of 0.5% and sides at 1V: 3H slopes as shown. Mannings n is 0.p2.if the depth of the flowing water is 2 ft the velocity is most nearly
Question 4
A local municipality must make a determination about the feasibility of repairing the bridge. The estimated useful life of bridge is 25 years. The Marr is 8%. The relevant cost estimates are shown. All costs are shown in thousands of dollars
Question 5
For the truss shown the member force k in member DI is most nearly
Question 6
The concept of the ________ states that the changes related to one requirement scope, time, or cost will atleast influence one other element
Question 7
You are in the process of contracting sellers to obtain bids and proposals. You found out that it might become a time consuming procedure to ensure that the sellers get a clear and common understanding of the procurement process and of the needs of your project. Which technique may help you save time?
Question 8
For a project the following earned value data have been assessed. How much the value of work had been done?
Question 9
A beam shown below. Which of the following represents the valid shape of bending moment diagram?
Question 10
A parabolic vertical curve is being designed to connect two grades with 5% and followed by 3%. If PVC is at station 117+50.00 the elevation on the PVT is most nearly
Question 11
A highway with the straight alignment slopes down to a stop line as shown. The design speed of the highway is 45 mph. The SSD is most nearly
Question 12
A crane is used to lift a load of 16 tonnes as shown. The crane cabin has a ballasted weight of 24 tonnes. The allowable soil pressure is 2800 lb/Sq. Ft. If the crane is supported by 4 outriggers, the minimum contact area of the out trigeer pads is most nearly
Question 13
In a steel plate with bolted connections the rupture of the net section is a mode of failure under
Question 14
In the bernoullis equation used in the pipe flow each term represents
Question 15
Who should evaluate the performance of a quality improvement team leader?
Question 16
During the course of project implementation any problems or issues that arise should be
Question 17
In order for self directed teams to be successful the Role of the group leader must be that of
Question 18
If the maximum moisture content is given to 17% and specific gravity of soil is given equal to 2.67 find the dry density according to the modified proctors test procedure
Question 19
In the temporary structure in the referred picture if the soil is un drained stiff clay which one is correct?
Question 20
Concrete curing shall be maintained above 50 Fahrenheit and in a moist condition for at least
Question 21
Find the maximum BM on a beam with the length of 20 ft for the two 2000lb moving load with the distance of 4 ft.
Question 22
A 3hr storm over a 150 Sq. Km area produces a total runoff volume of 7*106cubic meter with a peak discharge of 360 cubic m / sec. What is the total excess precipitation?
Question 23
For the scaffolding estimate the axial force in the bracings
Question 24
First operation during the detailed survey of Hill Road is,
Question 25
A 2g storm over a 111 Sq. Km area produces a total runoff volume of 4*10^6 cubic meter with a peak discharge of 260 cubic meter /sec. What is the total excess precipitation?
Question 26
In the activity network below what is the total float of task 5?